A.

Project Scope.
Notes and Photos by Able Group Inc.

Electric Service Upgrade

 


B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

 

Facility Discovery and
Service Project Notes:


 

Secondary Electric Service 120V / 208V. 3 Phase.



 

A.
Original Service.
See Diagram with Details at the very bottom.


 

B.
Original Fuse Panels #1. & #2.

Power Supply from
Separate Transformers


 

A.3.
Sub-Metering.
Power Supply for
Sub-tenants
Food Mart and
Day Care.

 


 

 

D. 
Note Doubled Up Lugs
.

E. 
Note Water Line of corrosion.

F.  
2 fused branch circuits being used.  Main Lug taps go to Day Care Meter.

 

G.
Day Care Fuses for the Rooftop Heating Unit.

H.
Food Mart fed from CT Cabinet


 

 

I. 
Equipment on the opposite side of the room.  Metering for Dollar General:

 


 

J. 
Ceiling mounted splicing trough and raceway:

K. 
Same
:

Ceiling mounted splicing trough and raceway:

 

L. 
Corroded Fuses and connections
:
 

M. 
Reading under full load from the Generator.
 

N. 
Entrance cable coming from across the street.
 

Diagram
with Details
Below