A.

Project Scope.
Notes and Photos by Able Group Inc.

Fleet Park - Eagle Express
2751 Red Lion Road

WO# 14256611.


B.

C.

D.

E.

 


 

Pre-Excavation Notes, 3/30/17:

F.

G.

H.

I.

J.

K.

L.


Project Scope for:


New 3Phase Electrical
Service 120V/208V
.
Power for Security Trailer, Truck Heater Receptacles and Pole Lighting.
 



 

PHOTO  A.
Underground locator service completed and excavation underway.

PHOTO  B.
High voltage conduit ran to the new Transformer Pad.
Ready for
Concrete Envelope.

PHOTO  C.
8 inches of crush stone as per specifications for Transformer Vault.

PHOTO  D.
Lighting discoveries begun. Looking for best case hardware match-up.

PHOTO  E.
LED Flood Light with similar mounting bracket.

175 Watt LED
approx. 700 watt equal.

PHOTO  F.
PRE-EXCAVATION NOTES:

The white lines indicate the plans for excavation.

41 Feet from the
HV Termination Pit
(red painted 2X4) to the new Transformer Pad.

PHOTO  G. 
PRE-EXCAVATION NOTES:


The PECO Transformer to be located here.
This location is inside the property line approx 75FT back from the street.

New 7' X 7'
Precast Transformer Pad to be placed here.

Secondary from this point to the new Security Trailer approx 56 Feet

PHOTO  H. 
PRE-EXCAVATION NOTES:


Location of the new Security Trailer.

Electrical service to be located 18 Feet from the fence in the rear (center of first parking space orange paint).


 

PHOTO  I.
PRE-EXCAVATION NOTES:


New Electrical Service to be installed here on concrete mounted pole/strut supports.

-Electrical Panel
-Metering Equipment.
-Control Box for Exterior Lighting.

PHOTO  J.
PRE-EXCAVATION NOTES:


Truck Heater Receptacles to be located here along the fence.
Receptacles to be concrete mounted uni-strut approx 1.5 Feet away from the fence and center of parking spaces 4. 5. 6. 7.

Lighting Circuit conduit to be brought up to the first light pole (approx 80FT).
 

PHOTO  K.
PRE-EXCAVATION NOTES:


Underground cable inspections made.
Circuit tracing and underground conduit locating required.


PHOTO  L.
PRE-EXCAVATION NOTES:


This is the
"Point of Origin" of underground circuits to the existing pole lights. 
These cables must be diverted to inside the property line of the customer.
 

NOTES:

80FT  from Service to
First Parking Lot Pole.

60FT  from Service to
Truck Heater #4.

18FT  from Service to Fence.

38FT  from Transformer to
existing Fence.

41FT. from HV Terminal Pit to the new XFMR